My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/7/1990
CBCC
>
Meetings
>
1990's
>
1990
>
8/7/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:45 PM
Creation date
6/16/2015 9:12:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/07/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fr- -1 <br />AUG 071990 <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Bird, the Board unanimously (4-0, <br />Commissioner Scurlock beipg absent) approved staff's <br />recommendation as set out in%the above memo. <br />CHANGE ORDER #3 AND WORK AUTHORIZATION MODIFICATION ARE ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br />WORK AUTHORIZATION WW -4A - MASTELLER AND MOLER ASSOC. - NORTH <br />COUNTY SEWER COLLECTION SYSTEM <br />The Board reviewed the following memo dated 7/31/90: <br />DATE: JULY 31, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO ;ICE`-' <br />DIRECTOR OF UTILITY S ICES <br />SUBJECT: WORK AUTHORIZATION NO. WW -4A ADDENDUM TO <br />WORK AUTHORIZATION WW -4 WITH MASTELLER AND <br />MOLER ASSOCIATES, INC. <br />IRC PROJECT NO. UW -87 -27 -CCS <br />• PREPARED WILLIAM F. McCAIN <br />AND STAFFED CAPITAL PROJECTS ENGINEER. <br />BY: A OF UTILITY SERVICES <br />BACKGROUND <br />As pointed out in our Capital Projects Report for the month of April <br />(to present), several design changes had to be made in the North <br />County Sewer Collection System and Effluent Disposal System. <br />Please see the attached monthly progress report, the Masteller and <br />.-Moler letter (Items No. 2 and 3, and the attached letter from - <br />Terrance G. Pinto, dated February 20th. <br />ANALYSIS <br />The design changes were necessitated for reasons that are explained <br />in the aforementioned attachments. Below, please find an itemized <br />list of the changes and associated engineering costs: <br />1. River Run connection due to $3,500.00 <br />Reflections not connecting to the <br />system at this time <br />2. Sandridge Golf Course pond modifications $4,400.00 <br />and effluent disposal line changes <br />Total $7,900.00 <br />Funds for this work will come from Account No. 435-000-169-413.00. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve Work Authorization WW -4A with <br />Masteller and Moler Associates, Inc. <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.