My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/4/1990
CBCC
>
Meetings
>
1990's
>
1990
>
9/4/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:42:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/04/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ E P 0 4 1990 <br />ANALYSIS <br />Design of the water -distribution system is complete, the DOT Permit <br />has been received, and the DER Permit application has been <br />submitted. Approval of Resolution III will confirm and approve the <br />preliminary assessments. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve .--Resolution No. III, which <br />affirms the preliminary assessment of the subject project. <br />imqvq <br />� MMGM0 <br />r=.airAI <br />olm, • .-- •,� <br />®rte <br />Chairman Eggert opened the Public Hearing, and asked if <br />anyone wished to be heard in this matter. There being none, she <br />closed the Public Hearing. <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Scurlock, the Board unanimously adopted <br />Resolution 90-100, confirming the special assessments <br />in connection with a water main in Hedden Place and <br />providing for special assessment liens to be made of <br />record. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.