My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/4/1990
CBCC
>
Meetings
>
1990's
>
1990
>
9/4/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:42:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/04/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 04-1990 <br />na 8_1 FA.ad&,,� -1 <br />ON MOTION by*Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />staff's recommendation of.,Alternative No. 1, as set out <br />in the above memo. <br />90TH AVENUE AND 8TH STREET WATER MAIN PROJECT <br />The Board reviewed the following memo dated 8/21/90: <br />DATE: AUGUST 21, 1990 <br />TO:. <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR� <br />FROM: <br />TERRANCE G. PINTO&s Plk%p <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED <br />WILLIAM F. McCAIN <br />AND STAFFED <br />CAPITAL PROJECTSR <br />BY: <br />DEPARTMENT OF UTIL SERVICES <br />SUBJECT: <br />90TH AVENUE AND 8TH STREET WATER MAIN <br />IRC PROJECT NO. UW -90 -17 -DS <br />BACKGROUND <br />The Utilities Department has recently completed construction of a <br />water line south of 20th Street on 90th Avenue to Heron Cay. In <br />keeping with our Utilities Department Water Master Plan, we now wish <br />to extend this line further south on 90th Avenue to 8th Street, then <br />east on 8th Street to tie into an existing water line. <br />ANALYSIS <br />To proceed with the above project, we must first have a survey of <br />the route made. We are proposing to use Masteller, Moler and Reed, <br />Inc. (from our short list of surveying firms) to perform the above <br />survey. The fees for survey work are $2,150.00. <br />We propose to take the survey notes and produce plans and <br />specifications for the project in-house. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the following: <br />1. The attached work authorization with Masteller, Moler and <br />Reed, Inc., for surveying of the job site. <br />2. That the staff of the Utilities Department be authorized <br />to proceed with in-house design, permitting and bidding of <br />this project. <br />59 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.