Laserfiche WebLink
SEP 04 1990 - <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously authorized <br />final payment to Citrus Panting and Irrigation, Inc. <br />in the amount of $13,640.76,,,as set out in the above <br />staff recommendation. <br />OCEAN BLUFF SUBDIVISION, WATER SYSTEM, CHANGE ORDER NO. 2 TO <br />SUMMERPLACE CONTRACT "PHASE TWO" WEST SIDE OF AIA WITH DERRICO <br />CONSTRUCTION <br />The Board reviewed the following memo dated 8/14/90: <br />DATE: AUGUST 141 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO J`P/ <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. McCAI <br />AND STAFFED CAPITAL PROJECTR <br />BY: DEPARTMENT OF UT ITY SERVICES <br />SUBJECT: OCEAN BLUFF SUBDIVISION, WATER SYSTEM, CHANGE ORDER <br />NO. 1 TO SUMMERPLACE CONTRACT "PHASE TWO" <br />WEST SIDE OF A -1-A WITH DERRICO CONSTRUCTION <br />BACKGROUND <br />Ocean Bluff Subdivision on the east side of A -1-A was permitted in <br />December 1987. The developer of this subdivision construed the <br />water distribution system as a dry -line system with the ent of <br />connecting to a main on A -1-A when constructed. The water system <br />was stubbed out on the east side of A -1-A as directed by the <br />Utilities Department. This was done at the time as the Department <br />originally intended the main on A -1-A to be on the east side of the <br />road. Subsequently, the A -1-A water main was installed by a <br />developer on the west side of A -1-A, not allowing for the connection <br />of Ocean Bluff. This was not of immediate concern due to the lack <br />of development in the subdivision; however, the homeowners' <br />association now desires to connect to our water system. <br />ANALYSIS <br />Two methods of connection were explored using the current contractor <br />of the Summerplace assessment project. The following is a summary <br />of the two options: <br />Proposal No. 1 <br />Jack and bore from the 12" main on the west side <br />of A -1-A <br />61 <br />$11,768.00 <br />