My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1990
CBCC
>
Meetings
>
1990's
>
1990
>
9/5/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:43:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
09/05/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SE? 0 5 1990 <br />OMB Director Baird reported that the reserve is $1,179,852 <br />as of the last check run. <br />Commissioner Scurlock noted thpt money all has been escrowed <br />and only can be spent for the Building%Department. He asked if <br />our total number of inspections is staying about the same, and <br />Administrator Chandler advised that although new construction has <br />slowed considerably, our number of inspections and our activity <br />is -increasing because repairs and alterations are increasing. <br />The Chairman determined that no one wished to be heard <br />regarding the Building Department budget and thereupon closed the <br />public hearing. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously (4-0) approved <br />a tentative budget of $1,106,194 for the Building <br />Department for FY 1990/91. <br />WATER & SEWER UTILITIES <br />Administrator Chandler announced that the total proposed <br />budget is $8,388,013, an increase of $2,522,893. We have several <br />significant increases all primarily related to two things which <br />are interrelated. Most notable is our system expansion in both <br />water and sewer. On top of that it has been mandated by the DER <br />that the wastewater plants be manned 24 hours a day, 7 days a <br />week. All this translates into the need for 26 additional <br />positions - 12 in sewer and 14 in water. Also, with the expan- <br />sion of the systems, there naturally are increases in basic <br />operating expenses. We do have a rate study under way, but with <br />the budget as presented, the expense increase is funded by the <br />increase in customer base and customer revenue. <br />The Chairman asked if anyone wished to be heard. There were <br />none, and she thereupon closed the public hearing. <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.