Laserfiche WebLink
T -� 6 <br />1990 <br />eoo <br />F,,;r 6 <br />Commissioner Bowman noted that the total <br />bid is <br />now 3 <br />times <br />the original amount, and she did not understand why they had to <br />eliminate overhead storage bins. <br />Commissioner Scurlock believed they decided they need three <br />work stations instead of one, and Administrator Chandler ex- <br />plained that they had 4 work stations budgeted and the bid was <br />structured on the unit price. <br />Commissioner Bowman then noted that in one place they talk <br />about a 24" x 24" return but on another page they talk about a <br />24" x 42" dimension, which she did not understand. <br />Public Works Director Davis explained that these units are <br />partitioned work stations which are needed so they can implement <br />the CAD system. Basically, they have recently remodeled some <br />portions of the Engineering Division to accommodate the CAD <br />equipment coming in and they have had to make some minor changes <br />in the floor plan. He can provide a floor plan if desired. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously awarded Bid <br />#90-108 to the low bidder, Blind Squirrel, for the <br />items set out in staff recommendation and approved <br />the award of a Fixed Contract with Blind Squirrel for <br />$10,715, per the following Bid Tabulation: <br />10 <br />