My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1990
CBCC
>
Meetings
>
1990's
>
1990
>
10/16/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:47 PM
Creation date
6/16/2015 9:50:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/16/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH COUNTY SEWER PROJECT - (CHANGE ORDER NO. 1, CONTRACT NO. 1) <br />The Board reviewed memo from Capital Projects Engineer <br />William McCain: <br />DATE: <br />SEPTEMBER 27, 1990 <br />TO: <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRA <br />FROM: <br />TERRANCE G. PINTO <br />DIRECTOR OF UTILIT SERVICES <br />STAFFED AND <br />- <br />PREPARED BY: <br />WILLIAM F. MICA <br />CAPITAL PROJECT <br />_ <br />DEPARTMENT OF UT TYSERVCES <br />SUBJECT: <br />CHANGE ORDER NO. 1, NORTH COUNTY SEWER PROJECT <br />CONTRACT NO. 1 <br />IRC PROJECT NO. US87-25—SC <br />The North County Wastewater Treatment Plant is now scheduled to be <br />complete by the end of October. There are several changes that now <br />need to be addressed. The first is resizing of several pumps; the <br />second is the addition of cabinets and countertops for the lab area. <br />Originally, the cabinets and countertops were to be installed after <br />construction; however, we have received such a good price from the <br />contractor, we wish to have them installed now. <br />ANALYSIS: <br />The costs associated with these changes are as follows: <br />1) Pump changes $ 6,378.00 <br />2) Cabinets 6.520.00 <br />Total: $12,898.00 <br />The original contract pri0e is $2,195,000.00; the revised contract <br />price will be $2,207,898.00. We are also requesting that the <br />retainage be reduced to 5% instead of 10% at the time of the next <br />pay request, which will be substantial completion. <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the following: <br />1) Change Order No. 1, in the amount of $12,898.00. <br />2) A reduction of retainage on the contract to 5%. <br />Chairman Eggert noted that this is another that is being _ <br />reduced to 5% retainage instead of 100, and it does involve <br />materials rather than services. She asked Director Pinto if we <br />are adequately covered with 5% retainage. <br />� 0T IN100 61 <br />mor <br />
The URL can be used to link to this page
Your browser does not support the video tag.