OCT 2 31990 BOOK <br />All bids exceeded the Engineering Division's estimate, which was <br />prepared based upon the cost of the most recent projects <br />completed by the Road and Bridge Division plus 25%. Since <br />bidding occurred during the recent mid -east conflict which <br />reflects uncertainty in petroleum products, bids may be high. <br />ALTERNATIVES AND ANALYSIS <br />The Road and Bridge Division is completing the Dixie Heights <br />Subdivision Petition Paving Project within the next three weeks. <br />That project included approximately six miles of paving at a cost <br />of- -approximately $1,019,460 or $32.18/LF. The assessment for <br />past -projects before Dixie Heights were as follows: <br />22nd Avenue - $ 9.66/FF <br />33rd Avenue - $ 10.40/FF <br />37th Avenue - $ 10.10/FF <br />Florida Ridge - $1,000/lot <br />Dixie Heights - $1,108.11/parcel <br />If the low bidders are awarded contracts for the above work, the <br />assessments will range from $20/FF to $25/FF. The 134th,Avenue <br />project in Roseland is being assessed on a parcel/acre basis and, <br />the cost would increase from the engineers estimated cost of <br />$3,986.77/acre to $4,597.65/acre. An approximately 25% increase <br />in costs over the preliminary assessment roll cost will result if <br />the work is performed under contract. Since the project bids <br />were received substantially over our estimate the following <br />alternatives are presented: <br />Alternative # 1 <br />Reject all bids and not award contracts since the Public <br />Works Department's estimates have been substantially <br />exceeded. The Road and Bridge Division could begin <br />construction by Nov. 15, 1990 on one of the subject projects <br />(probably 134th St) and complete all projects within 12 <br />weeks at a cost within the engineers cost estimate. <br />Alternative # 2 <br />Award the contracts to the low bidders ( 3 projects to - - <br />JoBear, Inc and 2 projects to Dickerson Florida, Inc). <br />Revise the assessment rolls and notify all property owners <br />that the assessments will increase substantially. <br />Additional public hearings will be necessary. <br />Alternative # 3 <br />Award the contracts to the low bidders as in Alternative No. <br />2 above and the County would assume the additional cost of <br />approximately $52,969. No additional public hearings nor <br />increased assessments would be necessary. <br />Alternative #4 <br />Contact the low bidders to determine if they are willing to <br />reduce the bids as applicable. If the projects can be <br />constructed within budget, staff would recommend award of <br />contracts. If the project costs cannot be reduced; staff - <br />recommends Alternative No. 1. Staff has already <br />communicated with one of the low bidders, Dickerson Florida, <br />Inc. and they have -offered to reduce the cost by eliminating <br />the Mobilization' Charge (approximately $1,944.00 per <br />project.). - <br />Alternative #5 <br />Rebid the projects. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends <br />and the Road and <br />projects. <br />Alternative No. 1 whereby all bids are rejected <br />Bridge Division be instructed to construct the <br />