Laserfiche WebLink
Commissioner Scurlock asked why the original design would <br />not be flexible enough to have broad specs in the first place, <br />and Engineer McCain explained that we were looking exclusively at <br />a precast plant at that time, and there is also some other repair <br />work that is necessary with the original plant. <br />Commissioner Scurlock recapped that then, as he understands <br />it, the resident inspection fees that would have been associated <br />with the construction (that portion of the contract that was in <br />March of 1987) have not been expended. So, you would have the <br />resident inspection on the overall construction plus an addi- <br />tional resident inspection of the new additional improvements of <br />$8,100 plus the actual engineering of $29,000. <br />This was confirmed by Mr. McCain. <br />Commissioner Scurlock asked if all the design associated <br />with the contract of March 187 other than resident inspection has <br />been completed and to our satisfaction, and this also was <br />confirmed. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bird, the Board unanimously approved Work <br />Authorization with Masteller 8 Moler as recommended <br />by staff. <br />7 1990 35 Boor b21 PAGE e� <br />