My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/27/1990
CBCC
>
Meetings
>
1990's
>
1990
>
11/27/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:47 PM
Creation date
6/16/2015 9:59:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/27/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N 0 V 2 ? 1990 aooK 82 PAGE 44 <br />NORTH COUNTY WASTEWATER TREATMENT SYSTEM (ADV. FOR DESIGN ENGR.) <br />The Board reviewed memo from Utilities Director Pinto: <br />DATE: NOVEMBER 16, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />OW <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF <br />UTILITY S RS <br />PREPARED WILLIAM F.44rITY <br />AND STAFFED CAPITAL PR R <br />BY: DEPARTMENT OSERVICES <br />SUBJECT: NORTH COUNTY WASTEWATER TREATMENT SYSTEM <br />BACKGROUND <br />The new North County Wastewater and Collection System is nearing <br />completion now. Due to recent capacity commitments and ongoing <br />collection system expansion projects; i.e., Kimball/Lloyd's being <br />assigned the first phase of the design expansion contract, we now <br />face the necessity of expansion of the newly -completed 1 MGD <br />treatment facility. <br />ANALYSIS <br />The construction of Phase II of the North County Wastewater <br />Treatment Plant is estimated to cost approximately $2,395,000, with <br />engineering costs of approximately 10%-12% of construction cost. In <br />keeping with the sewer service demand, wastewater Master Plan, and <br />the newly -approved Comprehensive Plan, expansion of this facility is <br />scheduled to be bid in May 1991. To meet this bid schedule, we must <br />now advertise for design engineers to begin the project. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve advertising Requests for <br />Qualifications to select a design engineer for the project <br />immediately. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bowman, the Board unanimously authorized <br />staff to advertise Requests for Qualifications to <br />select a design engineer for the above project. <br />38 <br />e � w <br />
The URL can be used to link to this page
Your browser does not support the video tag.