My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/1990
CBCC
>
Meetings
>
1990's
>
1990
>
12/18/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:47 PM
Creation date
6/16/2015 10:03:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/18/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE uistribution to: <br />ORDER OWNER la Williams <br />ARCHITECT IN M.GA <br />AIA DOCUMENT C701 CONTRACTOR ® Milne & Nicholls <br />FIELD F9 Yank MoJo <br />OTHER ® Proctor Const. <br />PROJECT: Indian River Coasnty Main Library ('HANCE ORDER NUMBER: 8 <br />Iname, address( 1840 25th Street <br />Vero Beach, Florida 32960 INITIATION DATE: November 13, 1990 <br />TO (Contractor): <br />ARCHITECT'S PROJECT NO. 88012900 <br />Milne & Nicholls, Inc. CONTRACT FOR: Ceneral Constrsction <br />701 S.E. 6th Avneue <br />Delray Beach, FL 33483 <br />J CONTRACT DATE: December 111 1989 <br />• You are directed to make the follc)wing changes in this Contract: ' 1 <br />C.C.D. #3 <br />P.R. #21 <br />Surveilence System Modifications ...... Add $ 500.00 <br />Tree Prining.......................... Add. $28G3.00 <br />Gere • <br />TOTAL ADD $3393.00 <br />Moroved Dalt <br />InE1sn ittwr ct r <br />L � <br />Admin. ti <br />i_e931 <br />Not valid until signed by both the Owner and Architect. <br />signalure ui the Cuntraetur indicates his agreement herewith, including any adjustment in the Contract Sum Ire Contracl Time. <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... E 2,816 9 400. 00 <br />Net change by previously authorized Change Orders ................................... S 47,204-00 <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... S 2,863,6174.00 <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) Mae aw!edI (ewei.e++gedi <br />bythis Change Order ... :............ s 33 3 .................................... , 9 .OC <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... S 2,866,9970 )Days. <br />The Contract Time will be 9wGT�d1 tdra.r l (unchanged) by <br />The Date_ of Substantial Completion as of the date of this Change Order therefore is Authorized: . <br />W HC LL GILMORE_ASSOCIATES MILNE & NICHOLLS, INC._ INDIAN RIVER COUNTY <br />.ARCHITECT CONTRACTOR OWNER <br />Address 4 S. A�3stralian AVE. A'(dress nBeF rl /lciclre» 181+0 25th Street <br />West; Pal Beach FL .33401 De a Vero Beach FL 32960 <br />j <br />` ItY <br />NY._.._�RYOf <br />DAl E {�� �VAT b DATE �a <br />AtA DOCUMENT G701 • CHANGE ORDER • At' It 1418 EDITION • AIA" ' h.' 19178 6701 — 1978 <br />THE AMERICAN INSTITUTE or ARCHITECTS. 17)5 NEW YORK AVE.. N.W.. WACHIN(:T()N. 0-C, M1111, <br />11 <br />4,3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.