My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/19/2010 (3)
CBCC
>
Meetings
>
2010's
>
2010
>
10/19/2010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 4:19:58 PM
Creation date
3/17/2016 12:32:56 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
10/19/2010
Meeting Body
No data from migration
Archived Roll/Disk#
4042
Book and Page
140, 035-066
Supplemental fields
SmeadsoftID
9188
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Davis, SECONDED by <br />Vice Chairman Solari, the Board unanimously approved <br />the award of contract to Dickerson Florida, Inc., in the <br />amount of $5,082,958.55, for 53rd Street roadway <br />improvements, as recommended in the memorandum of <br />October 8, 2010. <br />CONTRACT ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />12.L2. INDIAN RIVER LAGOON TMDL UPDATE PRESENTATION <br />Director Mora and Stormwater Engineer Keith McCully, P E , through a PowerPoint <br />presentation (on file), recapped the memorandum dated October 11, 2010, providing updated <br />status and a summary of the Total Maximum Daily Load (TMDL) program. They spoke about <br />the TMDL objective, degradation in water quality, fish species, the TMDL formula, the final <br />TMDLs for allocation and process, regulated entities within the County, the requirement that <br />every five years one-third of the total reduction must be achieved, and a summary of the TMDL <br />reduction potential. <br />Discussion ensued as Commissioners sought and received clarification regarding the <br />annual street sweeping budget, the pollution reduction goal, proposed projects eligible for TMDL <br />credits, and calculating/measuring nutrient levels. <br />(Clerk's Note: Following the presentation, the Chairman moved to the next agenda item, <br />no action was taken.) <br />October 19, 2010 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.