Laserfiche WebLink
8.N. WORK ORDER No. 22 TO THE PROFESSIONAL BRIDGE DESIGN SERVICES <br />AGREEMENT WITH BRIDGE DESIGNASSOCL4TES, INC. FOR CR512 <br />BRIDGE OVER FELLSMERE WATER CONTROL DISTRICT (F. W. C.D.) <br />LATERAL "U" CANAL RELEASE OF RETAINAGE <br />ON MOTION by Commissioner Davis, SECONDED by <br />Commissioner Flescher, the Board unanimously approved <br />payment of Bridge Design Associates, Inc. Invoice No. <br />10-567/3 dated November 1, 2010, in the amount of <br />$196.00 for release of retainage, as recommended in the <br />memorandum of November 5, 2010. <br />8.0. SECTOR 3 BEACH RESTORATION PROJECT, CHANGE ORDER #3, PRE- <br />PURCHASE FOR REMAINING PROJECT SAND REQUIREMENTS, RANGER <br />CONSTRUCTION INDUSTRIES, INC. <br />Chairman Solari, having opposed this matter previously, indicated that he would vote <br />against it. <br />ON MOTION by Commissioner Davis, SECONDED by <br />Commissioner Flescher, by a 4-1 vote (Chairman Solari <br />opposed), the Board approved Change Order No. 3 to <br />Ranger Construction Industries, Inc., as recommended in <br />the memorandum of November 5, 2010. <br />CHANGE ORDER ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />12 <br />November 16, 2010 <br />