Laserfiche WebLink
Information pertaining to the Proposal Request and Claim Items in <br />Change Order #7 are as follows: <br />Claim Item #1 - Revisions to Rooms A-109 and A-113. Rooms reversed <br />due to mechanical and fire piping conflicts. $1,952 and no time. <br />Error by architect. <br />Claim Item #2 - Revisions in walls in Rooms A-122 and A-123 <br />(Infirmary) due to block and duct conflict. Change block to steel <br />mesh. $420 and no time. <br />Claim Item #3 - Prebooking access panel which was requested by <br />Building and Grounds Division which will provide access to ceiling <br />for personnel. $84.00 and no time. <br />Claim Item #4 - Shower curbs (2) in showers for Rooms A-122 and A- <br />125. Needed for excess water spill over. Not shown on drawings by <br />architect. $143 and no time. <br />Claim Item #5 - Guard tower footing and slab relocation due to <br />unsuitable soil conditions and existing electrical line. Not -to - <br />exceed price of $3,875 and four (4) days with general conditions. <br />Claim Item #6 - Additional paving at sallypo:pt to access solid <br />waste container requested by Building and Grounds Division. $1,505 <br />and two (2) days without general conditions. <br />Claim Item #7 - Cable conduit relocated due to administrative <br />building was over top of entrance box due to omission by architect. <br />Needed for television cable to enter building. $450 and one (1) <br />day with general conditions. <br />Proposal Request #24 - Test and Balance of HVAC. PR to be deleted <br />since HVAC test and balance is recommended to be accomplished by <br />the owner and the issue is addressed further in this agenda item. <br />Proposal Request #25 - Site electrical changes. Change pole <br />parking lot lighting and bury existing conduit. $363 and no time. <br />Proposal Request #26 - Vinyl flooring deletion and posi-tread <br />application on Hubbelite to make flooring waterproof. Received <br />credit for existing floor covering. Credit of $250. <br />Credit Item - Credit on grouting at fire wall. Additional credit <br />from Proposal Request #5 previously approved. Additional credit of <br />$2,835 and no time involved. <br />Claim Item #8 - Installation of four inch (411) conduit for <br />electrical use. Conduit was not existing as shown. Time and <br />material not -to -exceed $750 plus one day with general conditions. <br />TOTAL <br />PROPOSAL REQUEST <br />AND CLAIM ITEMS <br />$9,542 <br />TOTAL <br />CREDIT - <br />3,085 <br />TOTAL <br />I+AYS - Eight w/6 <br />at General Conditions <br />@ $850 per day <br />5r 100 <br />TOTAL <br />FOR CHANGE ORDER <br />#7 <br />$11,557 <br />GRAND <br />TOTAL FOR CHANGE <br />ORDER #6 AND #7 <br />$16,778 <br />The position taken by the County Administrator is that any <br />additional funding caused by errors or omissions on the part of the <br />architect will be reviewed for submittal to the architect for <br />payment as the County deems appropriate. <br />25 <br />