Laserfiche WebLink
TO: Members of the Board <br />of County Commissioners <br />SUBJECT: BUDGET AMENDMENT <br />NUMBER: 032 <br />FROM: Joseph A. Baird DATE: April 5, 1991 <br />OMB Director �w <br />Entry <br />SECONDARY ROAD TRUST FUND <br />-G14-og1.- <br />-1 an -x ni - <br />AMENDMENT NO. 1 TO WORK ORDER NO. 2 FOR FINAL DESIGN OF TREASURE <br />SHORES PARK PHASE_I <br />The Board reviewed the following memo dated 3/28/91: <br />10%7 lvvrlv� <br />TO: James E. Chandler <br />N <br />County Administrator <br />THROUGH: James W. Davis, P.E., <br />.�r•,. <br />Public Works Director �`J* <br />FROM: Terry B. Thompson, P.E =-,P <br />Capital Projects Manager <br />SUBJECT: Amendment No. 1 to Work Order No. 2 for Final <br />Design of Treasure Shores Park Phase I <br />DATE: March 28, 1991 FILE: amdltres.agn <br />DESCRIPTION AND CONDITIONS <br />Brad Smith Associates, Inc. is under contract with Indian <br />River County to prepare construction drawings and <br />specifications for Treasure Shores Park Phase I. Through <br />the site plan approval process, it was determined that the <br />proposed restroom building is located in a velocity zone and <br />would have to be designed to meet Flood Emergency Management <br />Agency (FEMA) requirements. <br />The original project agreement requires that the Consultant <br />reuse the Golden Sands Park restroom design' with <br />modifications to fit the Treasure Shores Park Site Plan and <br />any revisions requested by the County. <br />15 POfiK Fr%�C <br />