My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. If the substitution requires a more extensive review, Engineer will <br />proceed with the review only after CONTRACTOR has agreed to <br />reimburse Owner for the review cost. <br />5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br />expense additional data about the proposed substitute. <br />H. Any redesign of structural members shall be performed by, and the plans signed <br />and sealed by, a Professional_ Engineer registered in the_State_of_Florida. _ The - - <br />redesign shall be at the CONTRACTOR's expense. Any redesign will require an <br />extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br />the Owner for the review cost prior to the Owner's Engineer proceeding with the <br />design review. The ENGINEER's hourly rate for review is $125 per hour. The <br />ENGINEER's estimated cost of review shall be provided to the CONTRACTOR <br />prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br />rescind the request. <br />I. Engineer will be allowed a reasonable time within which to evaluate each <br />proposed substitution. Engineer will be the sole judge of acceptability and shall <br />have the right to deny use of any proposed substitution. The CONTRACTOR <br />shall not order, install, or utilize any substitution without either an executed <br />Change Order or Engineer's notation on the reviewed shop drawing. Owner may <br />require CONTRACTOR to furnish at CONTRACTOR's expense a special <br />manufacturer's performance guarantee(s) or other surety with respect to any <br />substitute and an indemnification by the CONTRACTOR. ENGINEER will record <br />time required by Engineer and Engineer's consultants in evaluating substitutions <br />proposed by CONTRACTOR and in making changes in the Contract Documents <br />occasioned thereby. Whether or not a proposed substitute is sued, <br />CONTRACTOR shall reimburse Owner for the charges of Engineer and <br />Engineer's consultants for evaluating each proposed substitute. <br />J. Substitute materials or equipment may be proposed for acceptance in <br />accordance with this Section. In the event that substitute materials or equipment <br />are used and are less costly than the originally specified material or equipment, <br />than the net difference in cost shall benefit the Owner and CONTRACTOR in <br />equal proportions. This cost difference shall not be reduced by any failure of the <br />CONTRACTOR to base his bid on the named materials or equipment. <br />+ + END OF SECTION + + <br />01630-3 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71st St\Admim\bid <br />documents\Contract Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.