My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. It is the intent of the Specifications to place the responsibility on the <br />CONTRACTOR to restore to their original condition all items disturbed, <br />destroyed, or damaged during construction. Particular attention will be <br />placed on restoration of canals to equal or better condition than prior to <br />construction. <br />H. When finished surfaces require cleaning with cleaning materials, use only <br />those cleaning materials which will not create hazards to health or <br />property and which will not damage the surfaces. Use cleaning materials <br />only on those surfaces recommended by the manufacturer. Follow the <br />manufacturer's directions and recommendations at all times. <br />I. Keep the amount of dust produced during construction activities to a <br />minimum. At CONTRACTOR's expense, spray water or other dust control <br />agents over the areas, which are producing the dust. Schedule <br />construction operations so that dust and other contaminants will not fall on <br />wet or newly coated surfaces. <br />1.3 SITE CLEANUP AND RESTORATION <br />Prior to final completion, the OWNER, ENGINEER, INDIAN RIVER FARMS <br />WATER CONTROL DISTRICT, and CONTRACTOR shall review the site with <br />regards to site cleanup and restoration. Clean and/or restore all items <br />determined to be unsatisfactory by the OWNER or ENGINEER, at no additional <br />expense. <br />+ + END OF SECTION + + <br />01710 Site Cleanup <br />01710-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st St\Hdmim\bid documents\Contract <br />Documents\01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.