My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Sworn Statement under the Florida Trench Safety Act <br />E. Trench Safety Compliance (Shoring) shall be done and comply to Section 00454 <br />— Sworn Statement under the Florida Trench Safety Act <br />SECTION 108 —RECORD/ AS -BUILT DRAWINGS <br />GENERAL <br />Maintain, prepare and provide the ENGINEER with record documents as specified below, <br />except where otherwise specified or modified within the scope of work provided in the <br />specific project contract documents. The Contractor and/or Developer shall be responsible <br />for, and required to provide, Record Drawings as outlined in this section. <br />MAINTENANCE OF RECORD DOCUMENTS: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following project documents: Drawings, Specifications, <br />Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br />other modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available at all times for inspection by ENGINEER and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove them <br />from the field office. <br />5. Label each document "RECORD DRAWING" in 2 -inch high printed letters. <br />6. Keep record documents current at all times. <br />7. No work shall be permanently concealed until the required record data has <br />been obtained. <br />RECORD / AS -BUILT DRAWINGS <br />A. During the construction operation, the CONTRACTOR shall maintain records <br />of all deviations from the approved Project Plans and Specifications and shall <br />prepare therefrom "RECORD" drawings showing correctly and accurately all <br />changes and deviations from the work made during construction to reflect the work <br />as it was actually constructed. <br />B. The Record/As-Built survey shall be performed and subsequent plans <br />prepared by a Professional Surveyor and Mapper, registered in the state of <br />Florida and certified to the standards set forth in Chapter 472, Florida Statutes and <br />Chapter 5J-17.050 Florida Administrative Code (Florida Minimum Technical <br />Standards). <br />C. Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated in <br />such a way that the location of the construction may be compared with the <br />01025-2 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\bid documents\Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.