Laserfiche WebLink
surveys. <br />D. All Record/As-Built drawings are subject to review and approval by County <br />Surveyor. <br />ACCURACY <br />The CONTRACTOR will be held responsible for the accuracy and completeness of <br />Record Drawings and Electronic As-Builts and shall bear any costs incurred in finding <br />utilities as a result of incorrect data furnished by the CONTRACTOR. <br />COMPLETION OF WORK <br />Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings <br />to ENGINEER. Final payment will not be made until satisfactory record documents are <br />received and approved by ENGINEER. <br />[The remainder of this page was left blank intentionally] <br />01025-6 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st <br />St\Admim\bid documents\Contract Documents\Technical Specifications REVISED.doc <br />