My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Schedule construction to minimize erosion and stormwater runoff from the construction <br />site. Implement erosion control measures on disturbed areas as soon as practicable in <br />portions of the site where construction activities have temporarily or permanently <br />ceased, but in no case more than 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased. In addition to other temporary erosion <br />control measures that may be implemented, application of polyacrylamide is required <br />on all such disturbed areas within 7 days after the construction activity in that portion of <br />the site has temporarily or permanently ceased, unless final landscaping has been <br />installed. Polyacrylamide application shall be as specified herein. <br />D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required by its <br />manufacturer or the OWNER, until the system is no longer needed. If a water quality <br />violation occurs, immediately cease all work contributing to the water quality violation <br />and correct the problem. <br />E. Discharge shall not violate State or local water quality standards in the receiving <br />waters, nor cause injury to the public health or to public or private property, nor to the <br />Work completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and treatment <br />systems in accordance with Section 1340. <br />B. Stormwater Pollution Prevention Plan. <br />1.5 STATE CERTIFIED EROSION CONTROL SPECIALTY SUBCONTRACTOR IS <br />REQUIRED FOR INSTALLATION, AND MAINTENANCE <br />A. State Certified Erosion Control Specialty Subcontractor is Required for Installation and <br />Maintenance: Installation and maintenance of all erosion and stormwater pollution <br />control devices, shall be by a State Certified erosion control subcontractor who <br />specializes in the installation and maintenance of such devices. After installation, this <br />specialty subcontractor shall maintain the erosion and stormwater pollution control <br />devices until in the ENGINEER's sole opinion, the devices are no longer necessary <br />(such time not to extend past the date the OWNER formally accepts the project as <br />complete). Before beginning construction, submit to Indian River County for review <br />and approval, a Stormwater Pollution Prevention Plan (SWPPP), prepared by the <br />certified erosion control subcontractor. Construction shall not begin until the SWPPP <br />has been approved by Indian River County. Submit the approved SWPPP to the <br />01025-15 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Hdmim\bid <br />documents\Contract Documents\Technical Specifications REVISED.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.