Laserfiche WebLink
additional cost to the Owner and shall be guaranteed for three months. All replacement <br />shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth shall <br />be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws. <br />The numerical designations for fertilizer indicate the minimum percentages <br />(respectively) of (1) total nitrogen, (2) available phosphoric acid and (3) water-soluble <br />potash contained in the fertilizer. <br />The chemical designation of the fertilizer shall be 16-4-8. Fertilizer shall include iron, <br />minor nutrients and trace elements. At least 50 percent of the nitrogen shall be derived <br />from organic sources. At least 50 percent of the phosphoric acid shall be from normal <br />super phosphate or an equivalent source which will provide a minimum of two units of <br />sulfur. The amount of sulfur shall be indicated on the quantitative analysis card <br />attached to each bag or other container. <br />Contractor shall ensure 1 pound of nitrogen per 1,000 square feet. <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-5 and 2.34.8. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. Where <br />the soil is sufficiently loose and clean, the Owner, at his discretion, may authorize the <br />elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the second <br />application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br />per acre, or 10 pounds per 1,000 square feet, by a spreading device capable of <br />uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets from <br />bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with appropriate <br />tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be staggered <br />so as to avoid a continuous seam along the line of flow. Along the edges of such <br />01025-33 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Admim\bid <br />documents\Contract Documents\Technical Specifications REVISED.doc <br />