A. Verify that piping systems have been cleaned, inspected, and tested. <br />B. Coordinate scheduling of flushing, pressure testing, and disinfection activities <br />with tie-ins, certifications, and sequence of construction. <br />3.02 FLUSHING AND PRESSURE TESTING - PIPING <br />A. The Contractor shall furnish and install suitable temporary testing plugs or caps for <br />the water lines, all necessary pressure pumps, hose, pipe connections, meters, <br />gauges and other similar equipment, and all labor required, all without additional <br />compensation for conducting pressure and leakage tests and flushing of the <br />piping. Flushing and pressure testing shall be conducted in the following order. <br />B. After all piping lines have been installed and before pressure testing, each run of <br />pipe shall be thoroughly flushed so as to remove all debris and foreign matter <br />from the piping and equipment. Clean and flush all piping using potable water. <br />Sufficient flushing water and pigging shall be introduced into the piping to <br />produce a discharge that is clear with no evidence of silt or foreign matter is <br />visible. Contractor to provide means of discharging and disposing of water at <br />Contractor's expense. <br />C. Pressure testing ductile iron piping systems: <br />1. The test pressure for the water piping, irrigation quality water piping, and <br />force main piping systems constructed of ductile iron shall be 150 psi <br />and this pressure shall be maintained for a period of not less than two <br />hours. Tests shall be made between valves and as far as practicable <br />and as approved by the Engineer. Potable water from the distribution <br />system shall be used. Pressure shall not vary more than five (5) psi for <br />piping during the test periods or as approved by the Engineer. Allowable <br />leakage shall be computed on the basis of AVWVA C-600. <br />2. All leaks evident at the surface shall be uncovered and repaired <br />regardless of the total leakage as indicated by the test, and all pipes, <br />valves and fittings and other materials found defective under the test <br />shall be removed and replaced at the Contractor's expense. Tests shall <br />be repeated until leakage has been reduced below the allowable <br />amount. <br />3. In the judgment of the Engineer, should it not be practical to follow the <br />foregoing procedures exactly for any reason, modifications in the <br />procedure shall be made as approved by the Engineer. In any event, the <br />Contractor shall be responsible for the ultimate water tightness of the <br />piping within the preceding requirements. <br />3.03 DISINFECTION <br />A. The Contractor shall furnish and install suitable temporary connections to the <br />piping, all necessary pressure pumps, hose, pipe connections, meters, gauges <br />and other similar equipment, and all labor required, all without additional <br />01025-38 Technical Specifications <br />FAIDublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Admim\bid <br />documents\Contract Documents\Technical Specifications REVISED.doc <br />