Laserfiche WebLink
performed by utility owners. If such other work is not <br />noted in the Contract Documents, then: <br />1. written notice thereof will be given to <br />CONTRACTOR prior to starting any such other <br />work; and <br />2. if OWNER and CONTRACTOR are <br />unable to agree on entitlement to or on the <br />amount or extent, if any, of any adjustment in <br />the Contract Price or Contract Times that <br />should be allowed as a result of such other <br />work, a Claim may be made therefor as <br />provided in paragraph 10.05. <br />B. CONTRACTOR shall afford each other <br />contractor who is a party to such a direct contract and <br />each utility owner (and OWNER, if OWNER is per- <br />forming the other work with OWNER's employees) <br />proper and safe access to the Site and a reasonable <br />opportunity for the introduction and storage of <br />materials and equipment and the execution of such <br />other work and shall properly coordinate the Work with <br />theirs. Unless otherwise provided in the Contract <br />Documents, CONTRACTOR shall do all cutting, <br />fitting, and patching of the Work that may be required <br />to properly connect or otherwise make its several <br />parts come together and properly integrate with such <br />other work. CONTRACTOR shall not endanger any <br />work of others by cutting, excavating, or otherwise <br />altering their work and will only cut or alter their work <br />with the written consent of ENGINEER and the others <br />whose work will be affected. The duties and <br />responsibilities of CONTRACTOR under this <br />paragraph are for the benefit of such utility owners and <br />other contractors to the extent that there are <br />comparable provisions for the benefit of <br />CONTRACTOR in said direct contracts between <br />OWNER and such utility owners and other <br />contractors. <br />C. If the proper execution or results of any part of <br />CONTRACTOR's Work depends upon work per- <br />formed by others under this Article 7, CONTRACTOR <br />shall inspect such other work and promptly report to <br />ENGINEER in writing any delays, defects, or deficien- <br />cies in such other work that render it unavailable or <br />unsuitable for the proper execution and results of <br />CONTRACTOR's Work. CONTRACTOR's failure to <br />so report will constitute an acceptance of such other <br />work as fit and proper for integration with <br />CONTRACTOR's Work except for latent defects and <br />deficiencies in such other work. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for <br />the performance of other work on the Project at the <br />Site, the following will be set forth in Supplementary <br />Conditions: <br />1. the individual or entity who will have <br />authority and responsibility for coordination of <br />the activities among the various contractors will <br />be identified; <br />2. the specific matters to be covered by <br />such authority and responsibility will be <br />itemized; and <br />3. the extent of such authority and <br />responsibilities will be provided. <br />B. Unless otherwise provided in the <br />Supplementary Conditions, OWNER shall have sole <br />authority and responsibility for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these <br />General Conditions, OWNER shall issue all communi- <br />cations to CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of <br />ENGINEER, OWNER shall appoint an engineer to <br />whom CONTRACTOR makes no reasonable <br />objection, whose status under the Contract <br />Documents shall be that of the former ENGINEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data <br />required of OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRAC- <br />TOR promptly when they are due as provided in <br />paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements, Reports and Tests <br />A. OWNER's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in paragraphs <br />00700-27 00700 - General Conditions REV 5-10-13.doc <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71st ShAdmim\bid documents\Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />