My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. if ENGINEER ser+sider-s—the Werk <br />substantially oomplete ENGINEER will prepare- and <br />deliver to OWNER a tentative nertifin..te of S bstaptial <br />Completion mAOM shall fix the date of Substantial <br />GAiFe shall _he_ attaoherd to the n_e_rtifio_a_te_ <br />a tentative list of items •to he ,00mpleterd or Gerreoterd <br />beforefinal pavrm ent. OWNER shall have seven days— <br />after <br />reoeipt of the tentative oertifioate during whioh to <br />ake written ebjeotien to ENGINEER as t <br />pFevi ns of the` o ifioate or a h t If, after <br />ran irderino 6uGh ebjeotiens ENGINEF—=R ponoliirdels <br />that the—Werk—is net substantially GernPlete, <br />ENGINEER will within 14 mays after submission of the <br />n ,.�„9stati the FeaseRs–therefGF. if, after <br />ation of !lWN ' oe CAI(`_IAIFF= ? <br />Gonsid �-.stt' b€R s (�hiGGtiens rn <br />GGIRslders the 1A.fn k 6tantially Gemplete <br />' <br />ENGINEER ��ilil—�rrtw0tihin Said 1v 14 days exeGute and <br />tent t' a list of item to he Gempleterd or Ge FFeoterd) <br />as ENGINEER believes justified after oonsirderatien of <br />of the tentative GeFtifiGate ef Substantial GernpletiGR <br />FN1r_Ihlrrn ...:n deliyeF a., nVVNER and GQNTRAG <br />I sibilitielS pending final payment between <br />epefiati0R, raf*, andproieGten of the —::erg <br />int nae t utilities, in � iranpe anrd warranties <br />r�a;rRenar,o�l}ea,, .. <br />and —guarantees. Unless 6WN€R—ard <br />inform ENGINF—FR in ■iritinn prior to ENGINEER's <br />ssuing the definitive rvertifiGate of Substantial Gemple- <br />tion ENGINEER's afe-re-said reoommenrdation mill he <br />biRdiRg OR 0-I.AINFeR and CONTRACTOR URN final <br />payrnent. <br />B. OWNER shall have the right to exclude <br />CONTRACTOR from the Site after the date of <br />Substantial Completion, but OWNER shall allow COW <br />TRACTOR reasonable access to complete or correct <br />items on the tentative list. <br />14.05 Partial Utilization <br />A. Use by OWNER at OWNER's option of any <br />substantially completed part of the Work which has <br />specifically been identified in the Contract Documents, <br />or which OWNER, ENGINEER, and CONTRACTOR <br />agree constitutes a separately functioning and usable <br />part of the Work that can be used by OWNER for its <br />intended purpose without significant interference with <br />CONTRACTOR's performance of the remainder of <br />the Work, may be accomplished prior to Substantial <br />Completion of all the Work subject to the following <br />conditions. <br />1. OWNER at any time may request <br />CONTRACTOR in writing to permit OWNER to <br />use any such part of the Work which OWNER <br />believes to be ready for its intended use and <br />substantially complete. If CONTRACTOR <br />agrees that such part of the Work is <br />substantially complete, CONTRACTOR will <br />certify to OWNER and ENGINEER that such <br />part of the Work is substantially complete and <br />request ENGINEER to issue a certificate of <br />Substantial Completion for that part of the <br />Work. CONTRACTOR at any time may notify <br />OWNER and ENGINEER in writing that <br />CONTRACTOR considers any such part of the <br />Work ready for its intended use and substan- <br />tially complete and request ENGINEER to issue <br />a certificate of Substantial Completion for that <br />part of the Work. Within a reasonable time <br />after either such request, OWNER, <br />CONTRACTOR, and ENGINEER shall make <br />an inspection of that part of the Work to <br />determine its status of completion. If <br />ENGINEER does not consider that part of the <br />Work to be substantially complete, ENGINEER <br />will notify OWNER and CONTRACTOR in <br />writing giving the reasons therefor. If <br />ENGINEER considers that part of the Work to <br />be substantially complete, the provisions of <br />paragraph 14.04 will apply with respect to <br />certification of Substantial Completion of that <br />part of the Work and the division of <br />responsibility in respect thereof and access <br />thereto. <br />2. No occupancy or separate operation <br />of part of the Work may occur prior to <br />00700 - General Conditions REV 5-10-13.doc <br />00700-41 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71 st St\Admim\bid documents\Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.