My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />B. TEMPORARY SANITARY FACILITIES <br />1. Provide temporary toilet facilities separate from the job office. <br />Maintain these during the entire period of construction under this <br />Contract for the use of all construction personnel on the job. <br />Provide enough chemical toilets to conveniently serve the needs of <br />all personnel. Properly seclude toilet facilities from public <br />observation. <br />2. Chemical toilets and their maintenance shall meet the requirements <br />of State and local health regulations and ordinances. Immediately <br />correct any facilities or maintenance methods failing to meet these <br />requirements. Upon completion of work, remove the facilities from <br />the premises. <br />1.4 SECURITY <br />Full time watchmen will not be specifically required as a part of the Contract, but <br />the CONTRACTOR shall provide inspection of work area daily and shall take <br />whatever measures are necessary to protect the safety of the public, workmen, <br />and materials, and provide for the security of the site, both day and night. <br />1.5 TEMPORARY CONTROLS <br />Take all necessary precautions to control dust and mud associated with the work <br />of this Contract. In dry weather, spray dusty areas daily with water in order to <br />control dust. Take necessary steps to prevent the tracking of mud onto adjacent <br />streets and highways. <br />1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />Remove the various temporary facilities, services, and controls and legally <br />dispose of them as soon as the work is complete. The areas of the site used for <br />temporary facilities shall be properly reconditioned and restored to a condition <br />acceptable to the OWNER. <br />+ + END OF SECTION + + <br />01520-2 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1137-01d Dixie Hwy Resurfacing 53rd St to 71st St\Admim\bid <br />documents\Contract Documents\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.