My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />B. Information shown on the Drawings as to the location of existing utilities has <br />been prepared from the most reliable data available to the Engineer. This <br />information is not guaranteed, however, and it shall be this CONTRACTOR's <br />responsibility to determine the location, character and depth of any existing <br />utilities. He shall assist the utility companies, by every means possible to <br />determine said locations. Extreme caution shall be exercised to eliminate any <br />possibility of any damage to utilities resulting from his activities. <br />1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br />A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br />boxes, inlets and similar structures in the areas of construction that are to <br />remain in service shall be adjusted by the CONTRACTOR to bring them flush <br />with the surface of the finished work. <br />B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br />sequencing. CONTRACTOR shall make available survey reference markers to <br />the various utility companies. <br />+ + END OF SECTION + + <br />01541-5 F:\PublicWorks\ENGINEERING DIVISION <br />PROJECTS\1137-01d Dixie Hwy Resurfacing 53rd St to 71st St\Admim\bid documents\Contract <br />Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.