My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-000
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 11:38:22 AM
Creation date
3/23/2016 8:44:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
07/05/2012
Control Number
2012-0000
Entity Name
Dunkelberger Engineering & Testing, Inc.
Subject
Old Dixie Highway Roadway Coring
Area
Dispute Resolution Mediation
Project Number
PSL-10-3054 (BG 10.5)
Alternate Name
Work Change Directive
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000A\S0003SR.tif
Meeting Body
Board of County Commissioners
Meeting Type
NA
SmeadsoftID
13603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br />TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />1.1 GENERAL <br />A. Make all arrangements for transportation, delivery and handling of equipment <br />and materials required for prosecution and completion of the Work. <br />B. Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br />to the site only during regular working hours. Shipments shall be addressed and <br />consigned to the proper party giving name of Project, street number and city. <br />Shipments shall not be delivered to OWNER except where otherwise directed. <br />C. If necessary to move stored materials and equipment during construction, <br />CONTRACTOR shall move or cause to be moved materials and equipment <br />without any additional compensation. <br />1.2 DELIVERY <br />A. Arrange deliveries of products in accord with construction schedules and in <br />ample time to facilitate inspection prior to installation. <br />B. Coordinate deliveries to avoid conflict with Work and conditions at site and to <br />accommodate the following: <br />1. Work of other contractors, or OWNER. <br />2. Limitations of storage space. <br />3. Availability of equipment and personnel for handling products. <br />4. OWNER'S use of premises. <br />C. Do not have products delivered to project site until related Shop Drawings have <br />been approved by the ENGINEER. <br />D. Do not have products delivered to site until required storage facilities have been <br />provided. <br />E. Have products delivered to site in manufacturer's original, unopened, labeled <br />containers. Keep ENGINEER informed of delivery of all equipment to be <br />incorporated in the Work. <br />01610-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing 53rd St to 71st St\Admim\bid <br />documents\Contract Documents\01610 -Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.