My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-149 (2)
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-149 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 11:06:08 AM
Creation date
3/23/2016 8:45:25 AM
Metadata
Fields
FilePath
H:\Indian River\Network Files\SL00000B\S0003UZ.tif
Meeting Body
No data from migration
Meeting Type
NA
SmeadsoftID
13680
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />TR S�-�l�'H. CLERK <br />ATTACHMENT A-2 <br />REVISED GRANT WORK PLAN <br />Project Title: Indian River County Hurricane Repair Project <br />Project Location: Indian River County R20 — R51.3 <br />Project Background: This Project consist of the restoration and maintenance of approximately 32,090 feet (6.1 <br />miles) of critically eroded shoreline between FDEP Reference Monuments R20 and R51.3. The Sector 3 Beach <br />and Dune Restoration Project was constructed in three (3) separate phases from 2010-2012, placing approximately <br />550,000 cubic yards of sand in the project area. In October of 2012, the project was impacted by Hurricane Sandy. <br />Emergency dune nourishment was conducted jointly under authority granted under the FDEP Emergency Final <br />Order — OGC No. 12-1641. Design for a full dune repair project is ongoing, with construction anticiapted for <br />2014/2015. <br />The PROJECT shall be conducted in accordance with the terms and conditions set forth under this Agreement, all <br />applicable DEPARTMENT permits and the eligible project task items established below. All data collection and <br />processing, and the resulting product deliverables, shall comply with the standard technical specifications <br />contained in the DEPARTMENT'S Monitoring Standards for Beach Erosion Control Projects (2004) and <br />Geographic Information System Guidelines, unless otherwise specified in the approved Scope of Work (herein <br />after referred to as SOW) for an eligible PROJECT item. The monitoring standards and GIS guidelines may be <br />found at http://www del2state flus/beaches/publications/pdf/PhysicalMonitorinpStandards.12df. One (1) electronic <br />copy of all written reports developed under this Agreement shall be forwarded to the DEPARTMENT, unless <br />otherwise specified. <br />Project Description: <br />The deliverables listed below are to be completed and approved by the DEPARTMENT by the due date listed. <br />2.1 Design and Permitting of the Restoration <br />Coastal Planning and Engineering Inc. has been retained by Indian River County to conduct professional services <br />to assist the COUNTY with timely negotiation of acceptable FDEP and USACE permits for the proposed Dune <br />Repair Project. Specific tasks associated with these efforts include: FDEP and USACE Permit Negotiations and <br />Data Monitoring Support coordination services through receipt of Agency action. <br />Deliverable A: One electronic submission of the final design report. <br />Total Cost: $11,747 ($5,873.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable B: One electronic submission of 2013 Sector 3 beach profile monitoring surveys from Morgan & <br />Eklund, Inc. <br />Total Cost: $17,050 ($8,525 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable C: One electronic submission of the pre -application meeting minutes. <br />Total Cost: $5,991 ($2,995.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable D: One electronic submission of the environmental assessment. <br />Total Cost: $7,594 ($3,797— DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable E: One electronic submission of the permit application. <br />Total Cost: $22,598 ($11,299 —DEP funds). <br />Due Date: January 30, 2017. <br />DEP Agreement No. 14IR2, Amendment No. 1, Attachment A-2, Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.