My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for temporary construction facilities or storage of materials and equipment are to be <br />provided by and paid for by the Contractor. Easements for permanent structures or <br />permanent changes in existing structures are to be obtained and paid for by the Owner <br />unless otherwise provided in the Contract Documents. <br />H. The submission of a Bid will constitute an incontrovertible representation by Bidder that <br />Bidder has complied with every requirement of this the Instruction to Bidder, that <br />without exception the Bid is premised upon performing and furnishing the work required <br />by the Contract Documents and such means, methods, techniques, sequences or <br />procedures of construction as may be indicated in or required by the Contract Documents, <br />and that the Contract Documents are sufficient in scope and detail to indicate and convey <br />understanding of all terms and conditions for performance and furnishing of the work. <br />1.05 INTERPRETATIONS AND ADDENDA <br />A. All questions about the meanings or intent of the Contract Documents are to be directed <br />in writing to. PBS&J, Inc. 600 N. Broadway Avenue, Suite 310, Bartow, Florida 33830, <br />863.533.7000. Interpretation or clarifications considered necessary by Engineer in <br />response to such questions will be issued by Addenda mailed or delivered to all parties <br />recorded by Engineer as having received the Bidding Documents. Questions received less <br />than ten days prior to the date for the opening of Bids may not be answered. Only <br />questions answered by formal written Addenda will be binding. Oral and other <br />interpretations or clarifications will not be binding and will be without legal effect. <br />B. Addenda may also be issued to modify the Bidding Documents as deemed advisable by <br />Owner or Engineer. <br />1.06 BID SECURITY <br />A. Each Bid must be accompanied by Bid Security made payable to Owner in an amount of <br />five percent of the Bidder's maximum base bid price and in the form of a certified check; <br />cashiers check; or an AIA Document A310 Bid Bond issued by a surety meeting the <br />requirements of Paragraph 5.01 of the General Conditions. <br />B. The Bid Security of the Successful Bidder will be retained until such Bidder has executed <br />the Agreement and furnished the required Contract security, whereupon the Bid security <br />will be returned. If the Successful Bidder fails to execute and deliver the Agreement and <br />furnish the required Contract security within fifteen days after the Notice of Award, <br />Owner may annul the Notice of Award, and the Bid Security of that Bidder will be <br />retained by the County. <br />C. The Bid Security of other Bidders whom Owner believes to have a reasonable chance of <br />receiving the award may be retained by the Owner until the earlier of the seventh (7) day <br />after the effective date of the Agreement or the sixty-first (61 ) day after the Bid opening, <br />whereupon Bid security furnished by such Bidders will be returned. Bid security with <br />bids which are not competitive may be returned before the end of the sixty-day (60) <br />period. <br />1.07 CONTRACT TIME <br />00100-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.