SUPPLEMENTARY CONDITIONS <br />PART I - AMENDMENTS TO GENERAL CONDITIONS <br />These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction <br />Contract (EJCDC Document No. C-700, 2002 edition) and other provisions of the Contract Documents as <br />indicated below. All provisions which are not so amended or supplemented remain in full force and effect. <br />ARTICLE 2 - PRELIMINARY MATTERS <br />SC -2.01. Delete paragraphs 2.01A and B of the General Conditions in its entirety. <br />SC 2.03A. Delete paragraph 2.03A of the General Conditions in its entirety, and replace with the following: <br />The Contract Times will commence to run on the day indicated in the Notice to Proceed. A Notice to <br />Proceed may be given at any time within 60 days after the Effective Date of the Agreement. <br />SC 2.05A1. Add the following immediately at the end of subparagraph 2.05A1: using the Critical Path <br />Method (CPM). <br />SC 2.05A.4. Add new subparagraph 4 after the existing text of 2.05 of the General Conditions: <br />4. If this Project is an addition to an existing working plant, then the Contractor shall coordinate with the <br />Owner on tie-ins. The Owner shall have final say on plant shut down times and duration to make tie-ins. <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />SC -3.01 C. Add new paragraph D immediately after Paragraph 3.01 C of the General Conditions to read as <br />follows: <br />D. Each and every provision of law and clause required by law to be inserted in these Contract Documents <br />shall be deemed to be inserted herein, and they shall be read and enforced as though it were included herein <br />SC3.03A.3 Delete existing 3.03A.3 of the General Conditions in its entirety and replace it with the <br />following: <br />Contractor shall not be liable to Owner or Engineer for failure to report any such conflict, error, ambiguity, <br />or discrepancy in the Contract Documents unless Contractor knew or, in the exercise of ordinary care, <br />reasonably should have recognized such conflict, error, ambiguity, or discrepancy and failed to report it in <br />writing to the Owner and the Engineer. <br />SC 3.03B Delete existing 3.03B of the General Conditions in its entirety and replace it with the following <br />B. Resolving Discrepancies. Except as may be otherwise specifically stated in the Contract Documents, the <br />provisions of the Contract Documents shall be read together as a whole not in isolation so as to give meaning to <br />each provision; however, to the extent there is a conflict or inconsistency between or among provisions, the <br />strictest or most stringent standard shall apply. <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; <br />HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS <br />00800-3 <br />