SC 17.02 through and including 17.09. Add the following new paragraphs after paragraph 17.01 of the <br />General Conditions: <br />17.02. Utilities. The Contractor shall, at its expense, arrange for, develop and maintain all utilities in <br />Work areas to meet the requirements of the Contract. Such utilities shall be furnished by Contractor at no <br />additional cost to the Owner, and shall include, but not be limited to the following: public telephone service <br />for the Contractor's use; construction power as required at each point of construction; and water as required <br />throughout the construction. Prior to final acceptance of the Work the Contractor shall, at its expense, <br />satisfactorily remove and dispose of all temporary utilities developed to meet the requirements of the <br />Contract. The Owner will assume the utility costs directly related to its usage of areas in which it has taken <br />Beneficial Occupancy. <br />17.03. Drainage. The Contractor shall so conduct its operations and maintain the Work in such condition <br />that adequate drainage will be in effect at all times. Existing functioning storm sewers, gutters, ditches, and <br />other run-off shall not be obstructed. <br />17.04. Fire Hydrants. Fire hydrants on or adjacent to the highway shall be kept accessible to fire <br />apparatus at all times and no material or obstruction shall be placed within fifteen feet (15') of any such <br />hydrant. <br />17.05. Protection of Structures. Heavy equipment shall not be operated close enough to pipe headwalls or <br />other structures to cause their displacement. <br />17.06. Fencing. On all Work which includes fencing and where the Engineer determines it to be necessary <br />for maintaining the security of livestock or adjacent property, or for protection of pedestrians who are likely <br />to gain access to the Work from adjacent property, the Contractor shall erect an appropriate temporary <br />security fence as a first order of business. Temporary fencing shall be installed at temporary construction <br />easement areas on all commercial and residential properties appropriate to secure the Work area and protect <br />persons and domestic animals. At all times, the Contractor shall conduct the Work under secure temporary <br />fencing. Permanent fencing shall be addressed as required by the Plans and Specifications. <br />17.07. Record Drawings. The Contractor shall keep one record copy of all Specifications, Drawings, <br />Addenda, Modifications, and Shop Drawings at the site in good order and annotated to show all changes <br />made during the construction process. These items shall be available to the Engineer and shall be delivered <br />to the Engineer for the Owner. Record Drawings shall be submitted with each pay request. Record Drawings <br />shall be submitted with each pay request. Final acceptance of the Work will be withheld until the approval <br />of such documents are made by the Owner. <br />17.08. Progress Videotapes. Contractor shall deliver to the Owner both prior to commencing the Project <br />and before receipt of Final Payment, a DVD Type color videotape of the Project showing the site before and <br />after Work has been completed. Contractor shall audibly identify on the videotape the station numbers as <br />those areas of the Project are taped. The cost of the videotaping is included in the bid submitted by the <br />Contractor. <br />17.09. Commercial Activities. Contractor shall not establish any commercial activity or issue concessions <br />or permits of any kind to third parties for establishing commercial activities on land owned or controlled by <br />Owner. Contractor shall not allow its employees to engage in any commercial activities on the Project site. <br />