My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE <br />No. <br />PROJECT: DATE OF ISSUANCE: <br />OWNER: <br />(Name, Address) <br />CONTRACTOR: OWNER's Project No.: <br />ENGINEER: <br />CONTRACT FOR: ENGINEER's Project No.: <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a <br />Change Order based thereon will involve one of the following methods of determining the effect of the <br />change(s). <br />Method of determining change in Contract Price: <br />Time: <br />[ ] Time and Materials <br />[ J Unit Prices <br />[ ] Cost plus fixed fee <br />Estimated increase (decrease) in Contract Price <br />$ . If the <br />change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in Contract <br />[ ] Contractor's records <br />[ ] Engineer's records <br />[ ] Other <br />Estimated increase (decrease) in Contract Time <br />days. If the change involves an <br />increase, the estimated time is not to be exceed <br />without further authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor should <br />submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOMMENDED: APPROVED: <br />an <br />Engineer <br />Owner <br />Date: Date: <br />00800-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.