G. Concrete Sidewalk and Driveway Replacement: Shall include sidewalk and/or <br />driveway removed and replaced as a result of Contractor's operations. Minimum <br />widths of replacement shall be as described in specifications or as shown on the <br />plans. No separate payment will be made for concrete construction, including <br />sawcutting, excavation, formwork, reinforcing, or other work or materials required in <br />connection with concrete construction. The cost of all concrete sidewalk and <br />driveway replacement shall be included in the cost of the pipe. <br />H. Asphaltic Pavement Replacement: Shall include asphalt removed and replaced as a <br />result of Contractor's operations. Minimum width of replacement shall be as <br />described in the specifications or as shown on the plans. Work shall include <br />sawcutting, disposal of demo'd asphalt, and construction of the surface course, base, <br />subgrade materials, and pavement markings, testing and all else incidental thereto. <br />The cost of all asphaltic pavement replacement shall be included in the cost of the <br />pipe. <br />L Asphalt Pavement Overlay: Shall include all re -surfacing as a result of construction <br />operations. The work shall include tack coat, surface course and pavement markings. <br />Asphalt pavement overlay shall be included in the cost of the pipe. <br />J. Unimproved Driveway Replacement: Shall include (dirt, marl or shell) driveway <br />replacement/reconstruction removed and replaced as a result of the construction <br />operations. Work shall include subgrade and surface (shell) materials, compaction, <br />density testing, etc. Unimproved driveway replacement shall be computed using <br />linear fee, as measured along the centerline of the pipe installed. <br />K. Grassing: Measurement of grassing (seed or sod) shall be computed using the linear <br />feet, as measured along the water main pipe, or grassed area disturbed and restored as <br />a result of Contractor's operations. The entire width of the disturbed area shall be <br />grassed. Payment shall include all necessary grading, soil preparation, seeding, <br />sodding, fertilizer, mulch, and irrigation. <br />L. Construction Stake -Out: Measurement of construction stake -out shall be computed <br />as a lump sum item, for all required construction stake -out, including: layout and <br />survey of the proposed construction, setting of stakes as required, necessary <br />computations to establish the exact position of the work, establish reference to <br />baselines, and provide and maintain off -set stakes outside the limits of construction <br />and marked to show offset distance. <br />M. Record Drawings/As-built Survey: Measurement of record drawings/as-built survey <br />shall be computed as a lump sum item, for the preparation of "As -built Drawings", <br />including field survey, drawing preparation in "ACAD", with ties to state plan <br />coordinates, all in accordance with IRCUDS water and wastewater utility standards. <br />The as -built drawings shall be provided certified by a licensed and registered land <br />surveyor. <br />PAYMENT <br />Payment will be made at the respective contract unit and/or lump sum price for each item <br />shown in the Agreement, installed and accepted, which price and payment shall constitute <br />full compensation for furnishing all materials and performing all work in connection <br />therewith and incidental thereto. <br />01025-3 <br />