Laserfiche WebLink
AA4a, <br />�h <br />PRE-BID MEETING <br />Attendees: See attached spreadsheet <br />From: Matt O'Connor <br />CC: Kim Keefer <br />Subject: Indian River County North Remote Supply Wells <br />Date: January 7, 2010 <br />The meeting began with an overview of the project. Indian River County has drilled six wells and desires <br />to install well pumps and well, houses along with the raw water `piping. four of the six new wells will <br />require power and control wiring from the North Water Plant. Wells #7 and #9 will have power drops <br />Supplied by FPL and will not have power from the water plant.. Wells 97 and #9 will still have control <br />wiring from the plant. <br />CLARIFICATIONS: <br />County is arranging Environmental Survey. <br />The Estimate of Probable Cost is about $2 million. <br />Periodic inspections will be performed by PBSU with day to day inspections by Indian River County. <br />J <br />