My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRENCH SAFETY ACT COMPLIANCE STATEMENT <br />�1 Project Indian River County North WTP Raw Water Transmission S stem <br />J Bid Number # 2010024 <br />Instructions <br />Florida StatutesSections 553.60 through 553.64, known as the "Trench Safety Act" requires all <br />contractors engaged by Indian River County, Florida to comply with Occupational Safety and <br />Health Administration's excavation safety standard, found in 29 C.F.R. s. 1926.650 Subpart.P. <br />All prospective contractors are required to sign this Trench Safety Act Compliance Statement <br />and provide compliance cost information where indicated below. The costs for complying with <br />the Trench Safety. Act must be incorporated into this Project's base Bid. Certify this Statement in <br />the presence of a notary public. <br />Certification <br />1. I understand that.the Trench Safety Act requires me to comply with OSHA excavation safety <br />standards found in 29 C.F.R. section 1926.650 Subpart P. 1 will comply with The Trench Safety <br />Act and I will design and provide trench safety systems at all trench excavations in excess of five <br />feet in depth for th is Project. <br />2. The stimated. cost imposed by compliance with The Trench Safety Act wilt be: <br />Hca Dollars 'a" per linear foot of trench to be excavated. <br />3. The esti rh.ated'cost imposed by compliance with the Trench Safety Act will be: <br />foo 'tw Dollars $ per square foot of special shoring used. <br />4. The amount listed above has been included within the Base Bid, <br />Certified: VV-LQ� _yam <br />(Contractor) <br />By: <br />(Signature) <br />ri Y%A se s <br />(Typed or Printed Name) <br />STATE OF. L) VZ_Lcko� <br />COONTY <br />_ 2 00>10 <br />The foregoing instrument was acknowledged beforome�this o2�3 day of �Jy <br />by 'D. � '(�-> 0 S <br />who is personally known to m or has produced <br />as entification and who did (did not) take an oath. <br />Nota Public Yo1�* *`tr vtcbet.UMIGh7 <br />rY 3 * *N N&W Public Stets Of F ON& j <br />My Gbenmleslon CudMarch 11; 2012 <br />My Commission Expires: Off- 11— t�1 >� �� Ganun►sel�n#oD?W'm <br />00300-5 <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.