construction. <br />4. Locate all existing utilities in the area of work. <br />5. Submit and secure approval of shop drawings. <br />6. Mobilize all labor, equipment, and materials. <br />7. Deliver and store all equipment and materials to the job site. <br />8. Notify all utilities and other affected parties prior to initiating construction. <br />(b) From 0 calendar days to 240 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. . <br />3. Restore all disturbed areas to their pre -construction condition. <br />4. Correct all deficiencies noted by Engineer. <br />Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial Completion. <br />(c) From 241 calendar days to 270 calendar days from the effective date of <br />Notice to Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.2. Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the work is not completed within the <br />times specified in Paragraph 3.1 above, plus any extensions thereof allowed in accordance with <br />Article 12 of the General Conditions. They also recognize the delays, expense and difficulties <br />involved in proving in a legal proceeding the actual loss suffered by OWNER if the work is not <br />completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR <br />agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER <br />four hundred fifty dollars ($450) for each day that expires after the time specified in Paragraph 3.1 for <br />Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining work <br />within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall <br />pay OWNER four hundred fifty dollars ($450) for each day that expires after the time specified in <br />Paragraph 3.1 for completion and readiness for final payment. <br />ARTICLE 4 CONTRACT PRICE <br />4.1. OWNER shall pay CONTRACTOR for completion of the work in accordance with the <br />Contract Documents in current funds in the amount of $ 2,362,873.43 <br />ARTICLE 5 PAYMENT PROCEDURES <br />5.1. General. CONTRACTOR shall submit Applications for Payment in accordance with <br />Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as <br />provided in the General Conditions and the Contract Documents. <br />00530-2. <br />