My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond No. 5351 82P <br />(enter bond number) <br />BY THIS BOND, We Timothy Rose Contracting, InpaS Principal and Developers <br />Surety and Indemnita corporation, as Surety, are bound to Indian River County <br />C e em ailed Owner, in the sum of $ 2 3 6 2 , 8 7 3.4 3 , for payment of which we <br />bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and <br />Severally. <br />THE CONDITION OF THIS BOND is that if Principal: <br />1. Performs the contract dated May 11, 2010 , between Principal and Owner for <br />construction of North Water Treatment Plant Raw Water the contract being <br />made a part of Vis b Sn"'d y UMre e','M he times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work providod for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantor of ail work and matorials furnished under the contract for the <br />time specified in tho contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance"'„ <br />with any formalities connected with the contract or the changes does not affect StirtyT . <br />obligation under this bond.�'- <br />DATED ON ..,May � , 2010y -t <br />i`J • <br />Timothy Rose Contracting; <br />Nam C p al <br />By <br />of y Rose President <br />D lopers Surety and Indemnity <br />-Alme of Sure Company <br />BY - <br />Robert Barra AttornQy ,;Irk Fa6t <br />00610-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.