Laserfiche WebLink
b) whether or not use of the proposed <br />substitute item in the Work will require <br />a change in any of the Contract Docu- <br />ments (or in the provisions of any other <br />direct contract with Owner for other <br />work on the Project) to adapt the design <br />to the proposed substitute item; and <br />c) whether or not incorporation or use <br />of the proposed substitute item in con- <br />nection with the Work is subject to <br />payment of any license fee or royalty; <br />3) will identify: <br />a) all variations of the proposed <br />substitute item from that specified , and <br />b) available engineering, sales, <br />maintenance, repair, and replacement <br />services; <br />4) and shall contain an itemized estimate of all <br />costs or credits that will result directly or indi- <br />rectly from use of such substitute item, including <br />costs of redesign and claims of other contractors <br />affected by any resulting change, <br />B. Substitute Construction Methods or Procedures: If a <br />specific means, method, technique, sequence, or <br />procedure of construction is expressly required by the <br />Contract Documents, Contractor may furnish or utilize a <br />substitute means, method, technique, sequence, or <br />procedure of construction approved by Engineer. <br />Contractor shall submit sufficient information to allow <br />Engineer, in Engineer's sole discretion, to determine that <br />the substitute proposed is equivalent to that expressly <br />called for by the Contract Documents. The requirements <br />for review by Engineer will be similar to those provided <br />in Paragraph 6.05.A.2. <br />C. Engineer's Evaluation: Engineer will be allowed a <br />reasonable time within which to evaluate each proposal or <br />submittal made pursuant to Paragraphs 6.05.A and 6.05.13. <br />Engineer may require Contractor to furnish additional <br />data about the proposed substitute item. Engineer will be <br />the sole judge of acceptability. No "or equal" or substitute <br />will be ordered, installed or utilized until Engineer's <br />review is complete, which will be evidenced by either a <br />Change Order for a substitute or an approved Shop <br />Drawing for an "or equal." Engineer will advise <br />Contractor in writing of any negative determination. <br />D. Special Guarantee: Owner may require Contractor to <br />furnish at Contractor's expense a special performance <br />guarantee or other surety with respect to any substitute. <br />., E. Engineer's Cost Reimbursement: Engineer will record <br />Engineer's costs in evaluating a substitute proposed or <br />submitted by Contractor pursuant to Paragraphs 6.05.A.2 <br />and 6.05.13 Whether or not Engineer approves a substitute <br />item so proposed or submitted by Contractor, Contractor <br />shall reimburse Owner for the charges of Engineer for <br />evaluating each such proposed substitute. Contractor shall <br />also reimburse Owner for the charges of Engineer for <br />making changes in the Contract Documents (or in the <br />provisions of any other direct contract with Owner) <br />resulting from the acceptance of each proposed substitute. <br />F. Contractor's Expense: Contractor shall provide all data <br />in support of any proposed substitute or "or -equal" at <br />Contractor's expense. <br />6.06 Concerning Subcontractors, Suppliers, and <br />Others <br />A. Contractor shall not employ any Subcontractor, <br />Supplier, or other individual or entity (including those <br />acceptable to Owner as indicated in Paragraph 6.06.13), <br />whether initially or as a replacement, against whom <br />Owner may have reasonable objection. Contractor shall <br />not be required to employ any Subcontractor, Supplier, or <br />other individual or entity to furnish or perform any of the <br />Work against whom Contractor has reasonable objection. <br />B. If the Supplementary Conditions require the identity <br />of certain Subcontractors, Suppliers, or other individuals <br />or entities to be submitted to Owner in advance for <br />acceptance by Owner by a specified date prior to the <br />Effective Date of the Agreement, and if Contractor has <br />submitted a list thereof in accordance with the Supple- <br />mentary Conditions, Owner's acceptance (either in <br />writing or by failing to make written objection thereto by <br />the date indicated for acceptance or objection in the <br />Bidding Documents or the Contract Documents) of any <br />such Subcontractor, Supplier, or other individual or entity <br />so identified may be revoked on the basis of reasonable <br />objection after due investigation. Contractor shall submit <br />an acceptable replacement for the rejected Subcontractor, <br />Supplier, or other individual or entity, and the Contract <br />Price will be adjusted by the difference in the cost <br />occasioned by such replacement, and an appropriate <br />Change Order will be issued . No acceptance by Owner of <br />any such Subcontractor, Supplier, or other individual or <br />entity, whether initially or as a replacement, shall consti- <br />tute a waiver of any right of Owner or Engineer to reject <br />defective Work. <br />C. Contractor shall be fully responsible to Owner and <br />Engineer for all acts and omissions of the Subcontractors, <br />Suppliers, and other individuals or entities performing or <br />furnishing any of the Work just as Contractor is <br />responsible for Contractor's own acts and omissions. <br />Nothing in the Contract Documents: <br />1. shall create for the benefit of any such <br />Subcontractor, Supplier, or other individual or entity <br />any contractual relationship between Owner or <br />Engineer and any such Subcontractor, Supplier or <br />other individual or entity, nor <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-20 <br />