My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Contractor shall afford each other contractor who is a <br />party to such a direct contract, each utility owner and <br />Owner, if Owner is performing other work with Owner's <br />employees, proper and safe access to the Site, a reason- <br />able opportunity for the introduction and storage of <br />materials and equipment and the execution of such other <br />work, and shall properly coordinate the Work with theirs. <br />Contractor shall do all cutting, fitting, and patching of the <br />Work that may be required to properly connect or <br />otherwise make its several parts come together and <br />properly integrate with such other work. Contractor shall <br />not endanger any work of others by cutting, excavating, <br />or otherwise altering their work and will only cut or alter <br />their work with the written consent of Engineer and the <br />others whose work will be affected. The duties and <br />responsibilities of Contractor under this Paragraph are for <br />the benefit of such utility owners and other contractors to <br />the extent that there are comparable provisions for the <br />benefit of Contractor in said direct contracts between <br />Owner and such utility owners and other contractors. <br />C. If the proper execution or results of any part of <br />Contractor's Work depends upon work performed by <br />others under this Article 7, Contractor shall inspect such <br />other work and promptly report to Engineer in writing any <br />delays, defects, or deficiencies in such other work that <br />render it unavailable or unsuitable for the proper <br />execution and results of Contractor's Work. Contractor's <br />failure to so report will constitute an acceptance of such <br />other work as fit and proper for integration with <br />Contractor's Work except for latent defects and <br />deficiencies in such other work. <br />7.02 Coordination <br />A. If Owner intends to contract with others for the <br />performance of other work on the Project at the Site, the <br />following will be set forth in Supplementary Conditions <br />I. the individual or entity who will have authority <br />and responsibility for coordination of the activities <br />among the various contractors will be identified; <br />2. the specific matters to be covered by such <br />authority and responsibility will be itemized; and <br />3. the extent of such authority and responsibilities <br />will be provided. <br />B. Unless otherwise provided in the Supplementary <br />Conditions, Owner shall have sole authority and respon <br />sibility for such coordination. <br />7.03 Legal Relationships <br />A. Paragraphs 7.01.A and 7.02 are not applicable for <br />utilities not under the control of Owner. <br />B. Each other direct contract of Owner under Paragraph <br />7.0 LA shall provide that the other contractor is liable to <br />Owner and Contractor for the reasonable direct delay and <br />disruption costs incurred by Contractor as a result of the <br />other contractor's actions or inactions. <br />C. Contractor shall be liable to Owner and any other <br />contractor for the reasonable direct delay and disruption <br />costs incurred by such other contractor as a result of <br />Contractor's action or inactions. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these General Condi- <br />tions, Owner shall issue all communications to Contractor <br />through Engineer. <br />8.02 Replacement of Engineer <br />A. In case of termination of the employment of Engineer, <br />Owner shal I appoint an engineer to whom Contractor <br />makes no reasonable objection, whose status under the <br />Contract Documents shall be that of the former Engineer. <br />8.03 Furnish Data <br />A. Owner shall promptly furnish the data required of <br />Owner under the Contract Documents. <br />8.04 Pay When Due <br />A. Owner shall make payments to Contractor when they <br />are due as provided in Paragraphs 14.02.0 and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />A. Owner's duties in respect of providing lands and <br />easements and providing engineering surveys to establish <br />reference points are set forth in Paragraphs 4.01 and 4.05. <br />Paragraph 4.02 refers to Owner's identifying and making <br />available to Contractor copies of reports of explorations <br />and tests of subsurface conditions and drawings of <br />physical conditions in or relating to existing surface or <br />subsurface structures at or contiguous to the Site that have <br />been utilized by Engineer in preparing the Contract <br />Documents. <br />8.06 Insurance <br />A. Owner's responsibilities, if any, in respect to pur- <br />chasing and maintaining liability and property insurance <br />are set forth in Article 5. <br />8.07 Change Orders <br />A. Owner is obligated to execute Change Orders as <br />indicated in Paragraph 10.03. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.