My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:53:33 PM
Creation date
3/23/2016 8:35:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/13/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment Plant Raw Water Transmission System
Area
Pre Bid Meeting
Project Number
UCP 2422
Bid Number
201024
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000005\S0001WQ.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
8458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
including final payment, will impose responsibility <br />on Engineer: <br />a. to supervise, direct, or control the Work, or <br />b. for the means, methods, techniques, <br />sequences, or procedures of construction, or the <br />safety precautions and programs incident thereto, <br />or <br />c. for Contractor's failure to comply with Laws <br />and Regulations applicable to Contractor's <br />performance of the Work, or <br />d. to make any examination to ascertain how or <br />for what purposes Contractor has used the <br />moneys paid on account of the Contract Price, or <br />e. to determine that title to any of the Work, <br />materials, or equipment has passed to Owner free <br />and clear of any Liens. <br />5. Engineer may refuse to recommend the whole or <br />any part of any payment if, in Engineer's opinion, it <br />would be incorrect to make the representations to <br />Owner stated in Paragraph 14.02.13.2. Engineer may <br />also refuse to recommend any such payment or, <br />because of subsequently discovered evidence or the <br />results of subsequent inspections or tests, revise or <br />revoke any such payment recommendation <br />previously made, to such extent as may be necessary <br />in Engineer's opinion to protect Owner from loss <br />because: <br />a. the Work is defective, or completed Work has <br />been damaged, requiring correction or replace- <br />ment; <br />b. the Contract Price has been reduced by <br />Change Orders; <br />c. Owner has been required to correct defective <br />Work or complete Work in accordance with <br />Paragraph 13.09; or <br />d. Engineer has actual knowledge of the <br />occurrence of any of the events enumerated in <br />Paragraph 15.02.A. <br />C. Payment Becomes Due <br />I . Ten days after presentation of the Application for <br />Payment to Owner with Engineer's recommendation, <br />the amount recommended will (subject to the <br />provisions of Paragraph 14.02.13) become due, and <br />when due will be paid by Owner to Contractor. <br />D. Reduction in Payment <br />1. Owner may refuse to make payment of the full <br />amount recommended by Engineer because: <br />a. claims have been made against Owner on <br />account of Contractor's performance or furnish- <br />ing of the Work; <br />b. Liens have been filed in connection with the <br />Work, except where Contractor has delivered a <br />specific bond satisfactory to Owner to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling Owner to a <br />set-off against the amount recommended; or <br />d. Owner has actual knowledge of the occur- <br />rence of any of the events enumerated in <br />Paragraphs 14.02.B.5.a through 14.02.B.5.c or <br />Paragraph 15.02.A. <br />2. If Owner refuses to make payment of the full <br />amount recommended by Engineer, Owner will give <br />Contractor immediate written notice (with a copy to <br />Engineer) stating the reasons for such action and <br />promptly pay Contractor any amount remaining after <br />deduction of the amount so withheld. Owner shall <br />promptly pay Contractor the amount so withheld, or <br />any adjustment thereto agreed to by Owner and <br />Contractor, when Contractor corrects to Owner's <br />satisfaction the reasons for such action. <br />3. If it is subsequently determined that Owner's <br />refusal of payment was not justified, the amount <br />wrongfully withheld shall be treated as an amount <br />due as determined by Paragraph 14.02.C.1. <br />14.03 Contractor's Warranty of Title <br />A. Contractor warrants and guarantees that title to all <br />Work, materials, and equipment covered by any <br />Application for Payment, whether incorporated in the <br />Project or not, will pass to Owner no later than the time of <br />payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When Contractor considers the entire Work ready for <br />its intended use Contractor shall notify Owner and <br />Engineer in writing that the entire Work is substantially <br />complete (except for items specifically listed by <br />Contractor as incomplete) and request that Engineer issue <br />a certificate of Substantial Completion. <br />B. Promptly after Contractor's notification, , Owner, <br />Contractor, and Engineer shall make an inspection of the <br />Work to determine the status of completion. If Engineer <br />does not consider the Work substantially complete, <br />Engineer will notify Contractor in writing giving the <br />reasons therefor. <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.