My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2011 (4)
CBCC
>
Meetings
>
2010's
>
2011
>
03/15/2011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 2:11:31 PM
Creation date
3/23/2016 8:36:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/15/2011
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002II.tif
SmeadsoftID
11228
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ranger <br />Construction <br />Industries, Inc. <br />James D Gray, Jr. <br />Coastal Engineer <br />Indian River County Public Works <br />180127x' Street <br />Vero Beach, FI 32960 <br />RE: Project Name <br />RCI No <br />County <br />Subjects <br />Mr. Gray, <br />hLTEKNUIVE 1 <br />Sector 3 Beach and Dune Restoration <br />320-0105 <br />Indian River County <br />Reaau-est fi;r Roel Increase Revised <br />March 4, 2011 <br />Pursuant to recent conversations pertaining to the substantial increase in both diesel and off road fuel cost <br />since time of bid, please allow this letter to serve as a request for compensation for additional and <br />continuing cost associated with this unforeseeable increase in fuel cost. <br />At time of bid diesel fuel has increased $1.00 and off road fuel $.97. This could not have been anticipated <br />and has significantly increased cost to process, deliver and place specified material on above referenced <br />project. <br />Attached is a breakdown of cost associated with fuel increase cost for Phase II Construction. Please note all <br />parties involved have absorbed said additional cost in Phase I in an effort to continue construction at <br />current unit prices. Unfortunately this financial burden has become too great to continue to absorb and <br />County assistance is required. <br />Ranger respectfully request an increase of $1.08 per Cubic Yard for remaining construction to help absorb <br />this significant and unforeseeable increase in fuel cost that could not have possibly been anticipated at time <br />of bid. <br />If you have any questions or require additional information please do not hesitate to contact me. <br />Thank You, <br />112a 4,1 <br />Patrick Flynn <br />Project Manager <br />CC: Project File <br />Fred Waugh <br />Bob Schafer <br />4510 Glades Cut -Off Road, FT. Pierce, Florida 34981 - Phone: (772) 464-6460 - Fax: (772) 466-9559 <br />Mailing Address: P.O. Box 14589, FT. Pierce, Florida 34979-4589 • www.rangerconstruction.com <br />121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.