Laserfiche WebLink
$2.10 <br />$3.07 <br />$0.97 <br />Cost Based on Average 11 Hour Day, 4,380 Cubic Yards per Day <br />Gallons Per Hour <br />Articulated Off Road Truck (12x4) <br />48 <br />Excavator <br />9 <br />D-5 Dozer (4.5 x 2) <br />9 <br />DA Dozer <br />4.5 <br />Loader <br />5 <br />ATV <br />0.5 <br />Total Gallons Per Hour <br />76 <br />76 Gals per Hour x 11 Hrs per day = 836 Gals per Day <br />836 Gals per Day x $.97 = $810.92 per Day <br />$81(Y-92,-- pe Day / 4;380 GY per day; $' 18 per Cuialc Yard. <br />Total Increase in Fuel Cost Requested <br />Trucking $0.27 <br />Dredge and Processing $0.56 <br />Construction $0.18 <br />Sub Total Increase per Cubic Yard $1.01 <br />rA Tax $0.07 <br />Total ncr'e per Cubic Yard <br />123 <br />