My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2011 (4)
CBCC
>
Meetings
>
2010's
>
2011
>
03/15/2011 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 2:11:31 PM
Creation date
3/23/2016 8:36:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/15/2011
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002II.tif
SmeadsoftID
11228
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
south : us. ENEF;G'( IN�OIffll"ION RDMINIS�OTIn <br />PETKOLEU M i oTItEK. LIQUIDS <br />Fuel Increase Request <br />Sector Beach Renourlshment FUEL COST MA%7(14 1 APIEIL 2010 <br />— -� 3.0016ft 11 ON <br />Fuel Price 1N C REDS E, _-V3-b0—f'3.00 <br />t <br />Trucking Unit Cost iO Bid $2.60 <br />Current Unit Cos$3.60 = 0.601600M <br />increase $1.00 <br />Average 12 Loads per Truck per Day <br />Aver Ago. IS CYper Load <br />Average 216 Cubic Yards per Day. per Truck <br />Average 24 Miles per Load Round Trip <br />Average 51 iles per.Gall on. <br />Average 4.g Gallons per Round Trip <br />Average $ 4.80 perRound Trip @ $1:00 Increase 0.60 �GR I $ 2 • $$ 1goopo TRIP <br />I2 tR1PS pl <br />$4.80 per RoundTrip x 12 Round Trips per Day $57 6 per DayperTruck0.60�G�) = 2•g$' kDVND Tf!� <br />TRUCKIN'6 0.016Rtl 34.56 Iml.InwK1216 cv61C ofXIDAq <br />Off Road Fuel <br />Dredge and Processing Unit Cost @ Bid <br />Current. Unit Cost <br />Increase <br />Phase 1 <br />Dredging 0.286 Gals per Cubic Yard <br />Sc reeming/Loading 0.29 Galss per Cubic Yard <br />Total .576 Gals per Cubic Yard <br />'F S4.56 johl IT&ucK <br />= fo.16lcda1cKNRO <br />$ <br />2.10 <br />3:o� -W fUa: L cbsr Rw_C!,!AIflPFiL 20 I0 <br />$0.97 L'eSS MEML 4 STS *ES <br />Tmes = -10,54 f 6n11oo <br />= $ 3,00 —10.54 <br />= $ i .46 I&P1110i <br />:. INCOME 3.0-4 46 <br />260,000 Cubic Yards Phase II NOTE: 291,000 coot gW-05 ��21tilAIN►� <br />� 0,61 �6�IIQN <br />.576 Gals per Cubic Yard S (lirNS <br />149,760 Gallons LIP221000 Cy 16 $ <br />149,760 Gallons x$97 increase $145,267` I61I856 GRI tgSl132•16 <br />$145;267=�n�ease / 260,OOQ CY $ 56,per Cubic Yard, ,` <br />�101 = � 0.35 I CUBIC 00 <br />DREW I PR�1Ng0,61 =$9S,'_32.16(2g1,000C-1 <br />Sub tat increase Trudartg Dredging and _Processing $.83 per, Cubic Yard <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.