Laserfiche WebLink
�IS�II <br />INDIAN RIVER COUNTY / BEACH SECTOR 3 PROJECT <br />PHASE 2 CONSTRUCTION UPDATE <br />March 14, 2011 <br />Project Construction Summary <br />--- Beach and dune restoration project consisting of 580,300 cubic yards of sand <br />--- Phase 1 (south) ... Feb. 9, 2010 thru May 7, 2010 = 267,182 cubic yards <br />... Dec. 1, 2010 thru Dec. 17, 2010 = 32,118 cubic yards <br />--- Phase 2 (north) ... Feb. 28, 2011 thru April 30, 2011 = 281,000 cubic yards <br />--- 6% miles of coast between Treasures Shores Park and Town of Indian River Shores <br />--- Sand provided by upland (inland) sand mines and delivered via truck <br />--- Ranger Construction Industries of Fort Pierce selected by County to perform work <br />--- $10,319,233 project construction cost shared by County and Sebastian Inlet District <br />Phase 1— construction completed Dec. 17, 2010 <br />Phase 2 <br />The Phase 2 construction area is a 2.3 mile section of beach beginning at the Seaview <br />Development and extending south to northern Orchid. Based on a January, 2011 beach <br />profile survey, the total volume of sand needed to construct Phase 2 is 281,000 cubic yards. <br />Phase 2 construction began on February 28, 2011. Beach access for Phase 2 will be divided <br />between Treasure Shores Park and Golden Sands Park. <br />Construction Update <br />Staff is maintaining a Sector 3 project website which includes weekly construction updates <br />as well as project photos. The web link can be found on the County website at <br />www.ircgov.com, under "SECTOR 3 BEACH RESTORATION PROJECT". <br />The contractor is currently using Golden Sands Beach Park for access and is delivering sand <br />to the north Windsor area. As of March 11th, approximately 38,400 cubic yards or 13.7% of <br />the 281,000 cubic yards estimated to complete Phase 2 have been delivered. <br />To minimize material losses from high surf and strong northeast winds experienced during <br />the first two weeks of construction (Feb 28th — March 11th), the contractor constructed a <br />majority of the upper dune portion of the construction template. To date, approximately <br />2,000 linear feet of dune have been constructed of which 600 linear feet of the construction <br />template fronting the northern portion of Windsor beaches have been completed. <br />Construction Schedule <br />As of March 11th, there are 35 construction days, not including weekends, remaining to <br />complete Phase 2 prior to May 1, 2011. With 22% of available time now elapsed, the <br />Contractor must maintain an average daily delivery of approximately 6,950 cubic yards or <br />386 truck loads to meet the beach fill requirements of Phase 2. The most recent 2 -week <br />average was 201 trucks per day. Due to inclement weather, Ranger did not haul material on <br />Friday, March 11th. Ranger worked Saturday, March 12th to make up for the lost workday. <br />The March 12th sand volume is not included in the calculations detailed above. <br />I <br />