My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE <br />No. <br />PROJECT:WEST REGIONAL WWTP ANAEROBIC TANKS ODOR CONTROL SYSTEM <br />DESIGN <br />DATE OF ISSUANCE: <br />OWNER: Indian River County 1800 27th Street Vero Beach Florida 32960 <br />(Name, Address) <br />CONTRACTOR: OWNER's Project No.: <br />ENGINEER: Michael C. Hotchkiss, P.E. <br />CONTRACT FOR: <br />ENGINEER's Project No.: UCP 4067 <br />You are directed to proceed with the following change(s): <br />Description: <br />Purpose of Work Directive Change: <br />Attachment(s) (list documents supporting change): <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any <br />claim for a Change Order based thereon will involve one of the following methods of determining the <br />effect of the change(s). <br />Method of determining change in Contract Price: <br />Time: <br />[ ] Time and Materials [ ] <br />[ ] Unit Prices <br />[ ] Cost plus fixed fee <br />Estimated increase (decrease) in Contract Price <br />$ . If the <br />change involves an increase, the estimated <br />exceed <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in Contract <br />Contractor's records <br />[ ] Engineer's records <br />[ ] Other <br />Estimated increase (decrease) in Contract Time <br />days. If the change involves an <br />increase, the estimated time is not to be <br />without further authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOM ENDED: APPROVED: <br />M <br />Engineer <br />Date: <br />la <br />Date: <br />00800-24 <br />Owner <br />
The URL can be used to link to this page
Your browser does not support the video tag.