My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />PROJECT WEST REGIONAL WWTP ANAEROBIC TANKS ODOR CONTROL SYSTEM <br />DESIGN <br />DATE OF ISSUANCE <br />OWNER Indian River County <br />OWNER's Contract No <br />CONTRACTOR <br />EFFECTIVE DATE <br />SBS Project No. 09-069 <br />ENGINEER Michael C. Hotchkiss, P.E. <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Reason for change order: <br />Ld t ortin chan e <br />Attachments. ist ocumen s su <br />CHANGE IN CONTRACT PRICE <br />CHANGE IN CONTRACT TIME <br />Original Contract Price <br />Original Contract Times <br />$ <br />Substantial Completion: <br />Ready for final payment: <br />Das or dates <br />Net changes from previous Change Orders <br />Net change from previous Change Orders <br />No. to No. <br />No. to No. <br />$ <br />days <br />Contract Price prior to this Change Order <br />Contract Time prior to this Change Order <br />$ <br />Substantial Completion: <br />Ready for final payment: <br />Das or dates <br />Net Increase (decrease) in this Change Order <br />Net Increase in this Change Order <br />$ <br />days <br />Contract Price with all approved Change <br />Contract Time with all approved Change <br />Orders <br />Orders <br />$ <br />Substantial Completion: <br />Ready for final payment: <br />Das or dates <br />RECOMMENDED: APPROVED: <br />By: By: <br />Engineer (Authorized Signature) Owner (Authorized Signature) <br />Date: <br />Date: <br />ACCEPTED. <br />By: <br />Contractor (Authorized Signature) <br />Date: <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.