My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-018B
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-018B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2018 2:10:04 PM
Creation date
3/23/2016 8:37:03 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
01/22/2018
Control Number
2013-018B
Agenda Item Number
8.H.
Entity Name
West Regional Wastewater Treatment Plant
Subject
Anaerobic Tanks Odor Control System Design
Project Number
UCP - 4067
Bid Number
2013013
Alternate Name
WWTP
Supplemental fields
FilePath
H:\Indian River\Network Files\SL000008\S0002K7.tif
Meeting Body
Board of County Commissioners
Meeting Type
BCC Regular Meeting
SmeadsoftID
11749
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Completion: <br />a. Before ENGINEER issues a Certificate of Substantial Completion, submit to <br />CONTRACTOR a list of observed items requiring completion or correction. <br />b. Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or <br />corrected. <br />C. Verify that all items on final list have been completed or corrected and make <br />recommendations to ENGINEER concerning acceptance. <br />C. LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically <br />called for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />6. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />*END OF SECTION* <br />00800-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.