Laserfiche WebLink
l Record locations, with horizontal and vertical data, on Project Record <br />Documents.itrumentation and similar appropriate <br />B. Establish lines and levels, locate and lay out, by ns <br />means: <br />1 Site improvements <br />a. Stakes for grading, fill and topsoil placement. <br />b. Utility slopes and invert elevations. <br />2. Batter boards for structures. <br />3. Building foundation, column locations and floor levels. <br />4, Controlling lines and levels required for mechanical and electrical trades. <br />C, From time to time, verify layouts by same methods. <br />grades prior to construction of line work for all piping 4 inches in <br />D. Establish all lines and g p rade. <br />diameter and larger at 50 -feet increments and at defined breaks in g <br />1.07 RECORDS progresses. <br />A., Maintain a complete, accurate tog of all control and survey work as it rog <br />rk <br />Update the project record drawings on a mont al condition for approval basis based on the oof monthlyed <br />B. p request as <br />during the month ending at the pay q <br />progress payment requests. <br />._ -1 ...., —Ai iratl hllS. <br />