Laserfiche WebLink
SECTION 01170 <br />SPECIAL PROVISIONS <br />PART 1— GENERAL <br />1.01 INSTALLATION OF EQUIPMENT <br />A. Special care shall be taken to ensure proper alignment of all equipment with particular <br />reference to the pumps and electric drives. The units shall be carefully aligned on their <br />foundations by qualified millwrights after their sole plates have been shimmed to true <br />alignment at the anchor bolts. The anchor bolts shall be set in place and the nuts tightened <br />against the shims. After the foundation alignments have been completed, the bedplates or <br />wing feet of the equipment shall. be securely bolted in place. The alignment of equipment <br />shall be further checked after securing to the foundations, and after conformation of all <br />alignments, the sole plates shall be finally grouted in place. The Contractor shall be <br />responsible for the exact alignment of equipment with associated piping and under no <br />circumstances, will "pipe springing" be allowed. <br />B. All wedges, shims, filling pieces, keys, packing, grout, or other materials necessary to <br />properly align, level and secure apparatus in place shall be furnished by the Contractor. <br />A 11 _—:—.o,,AA,-i r,. t,P. „t„mh or level must be proven exactly so. Perform all grinding <br />