Laserfiche WebLink
SECTION.00300 . <br />BID FORM <br />(Based Upon EJCDC No.0-700, 2002 Ed.) <br />PROJECT IDENTIFICATION: Indian River County Bid # 2013013 <br />West °Reeionh! WWTP Anaerobic Tanks <br />Odor Control Systetii Desitin <br />r= <br />PROJECT DESCRIPTION: ' <br />CONTRACTOR shall complete all work as specified or indicated in the Contract Documents. The work ! <br />is generally described as follows, which shall include, but is not necessarily limited to the following: <br />The Project includes Flat Aluminum Covers for two Anaerobic Tanks, Odor Control System, Building <br />around the existing Grit Handling Equipment, Aluminum Canopy over existing sludge odor control <br />equipment, two confined space entry kits, four roll -off dumpsters, Yard Piping Electrical/Controls, <br />Instrumentation/SCADA, Landscaping Buffer and irrigation. All ancillary work associated with these <br />systems are to be included. <br />x: <br />THIS BID IS SUBMITTED TO: Indian River County Purchasint Division C <br />1800 27P.Street. Adtfijn: Blde, B <br />Vera Beach. F.E. 32960 <br />1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement <br />with Owner in the form included in the Contract Documents to perform and furnish all work as <br />specified or indicated in the Contract Documents for the Contract Price and within the Contract <br />Time indicated in the Contract Documents and in accordance with the other terms and conditions <br />of the Contract Documents. <br />2. Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and <br />Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the <br />day of Bid opening. Bidder will sign and submit the Agreement with the bonds and other <br />documents required by the Bidding Requirements within fifteen (15) calendar days after the date <br />of Owner's Notice of Award per 1.15 H. in Section 001.00. <br />3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that: �4 <br />(a) Bidder has examined copies of all the Bidding Documents and of the following Addenda <br />(receipt of all which is hereby acknowledged): <br />Date Number <br />(i <br />December 5, 2012 #1 <br />is <br />i. <br />December 7, 2012 #2 <br />l <br />G <br />11, <br />